Ebara Coupling
Our company provide professional technical service for power plant couplings, Geared Hydraulic couplings overhaul, Voith coupling maintenance for owned power plant. In 2016, we have finished energy saving project for Baotou Second Power Plant, 200mw unit, GCH104-47A couplings, to replace gear box, transform booster pump and add new motor. After the transformation, the electricity saving ratio is 23%
Besides, we are specialize in comprehensive solution proposal of energy saving transformation for boiler feed water pump in thermal power plant.
It is true that the powr consumption rate of T-BFP is higher to M-BFP, so there is a requirement to transform the M-BFP, in order to decrease the station service power consumption rate:
The methods of transformation include the followings:
1. transform the M-BFP to T-BFP
2. transform the hydraulic coupling
3.transform the BFP
4. transform the speed adjusting mode of M-BFP. That means changing from the hydraulic coupling speed to frequency conversion.
And do you know which is the best method? And how to transform?
Please contact us directly if you are interested in this project.
CONTACT US
Shenyang German Machine Hydraulic Transmission Machinery Co., Ltd.
Contact Person: Olivia
Phone:86-24-31309368
Fax:86-24-25304080
Address: No.83, Shenhu Road, Yuhong Dist, Shenyang,Shenyang,Liaoning